Sourcing kit
AI Rack Power Kit
A rack power kit for GPU servers: rack PDUs for AI racks plus a matched C13 C19 power cord kit, specified against your actual rack power and target country, and quoted as one PDU RFQ. Sourced in China, checked before shipment — rack-level GPU rack power distribution accessories only, no UPS and no high-voltage equipment.
What This Kit Is For
A GPU rack draws several times the power of a standard rack, and ordinary office-IT power accessories are not specified for it. This AI rack power kit exists for the moment a deployment hits that wall: the servers are ordered, the facility feed is known, and someone has to turn “30 kW per rack in another country” into the right PDU, the right input plug, and the right cord mix — as one order instead of five.
- Fitting out new GPU racks where PDU capacity, input plug, and C13/C19 outlet mix must match both the facility feed and the server PSUs.
- Shipping racks to another country, where data center power cord sourcing means a different plug standard and certification regime than the build site.
- Standardizing one power spec across a row, so every rack repeats the same PDU model and cord lengths instead of accumulating one-off fixes.
Typical Buyers and Use Cases
This kit is bought by people accountable for racks powering on — not by electricians. They know their rack power and deadline; what they need is a rack power accessories supplier in China that converts those numbers into a correct, certified, shippable power package.
- GPU server builders shipping assembled racks abroad, who need rack PDU for AI racks plus country-correct cord sets in the same crate.
- Small data centers upgrading existing rows for AI load, replacing legacy PDUs with metered or switched units.
- IT integrators and MSPs delivering installs against a date, who cannot absorb a re-order caused by a wrong plug.
- Edge data centers running unmanned sites, where remote power monitoring per outlet earns its cost.
- Resellers and distributors stocking a repeatable C13 C19 power cord kit alongside the hardware they sell.
What Is Included
Everything between the facility feed and the server power supplies, quoted as one package. Each line is specified against your rack power and target country — we do not quote a PDU without knowing what it plugs into.
Options and Specifications
AI server rack PDU sourcing is a specification exercise before it is a price exercise. These are the parameters we lock per rack before quoting — together they determine whether the kit powers on first try in the destination facility.
RFQ Information Required
The PDU RFQ form captures the fields below — they map one-to-one to how a power kit is actually specified. If you are unsure on any of them, the PDU RFQ checklist walks through where each number comes from. Add target country and deadline so certification and lead time are quoted correctly from the start.
Each accessories line priced against the exact specification you submit.
Outlet maps and ratings to verify against your servers before ordering.
Plug faces, outlet counts, and labels verified on camera before dispatch.
CE / UL / RoHS documentation matched to the production batch.
Basic / Standard / Pro Quote Structure
Common Mistakes to Avoid
Power is where accessory mistakes get expensive, because a wrong power kit blocks everything downstream. These are the recurring failures in the PDU RFQs we receive — and the boundary of what we will and will not quote.
- Wrong plug type for the target country — the single most common reason a power kit gets re-ordered.
- Outlet mix mismatch — counting C13 outlets when the GPU server PSUs require C19.
- Unclear rack power — a PDU specified by guesswork trips under sustained GPU load.
- Missing cord lengths — cords that cannot reach a bottom-of-rack PDU stall the install.
- Unverified certificates — CE or UL paperwork that does not match the batch fails import inspection.
- Out-of-scope requests — we do not supply UPS systems, high-voltage switchgear, or facility electrical equipment. Rack-level power distribution accessories only.
Every field a complete PDU RFQ needs — run through it before you submit.
Which cord your GPU server PSUs actually take, and why it matters.
Send your power kit requirements and get a quote in 24–48 hours.
Browse the full set of AI infrastructure accessories kits.
Request a Kit Quote
Send a PDU RFQ with your rack count, rack power, voltage, plug type, and outlet mix. We reply within 24–48 hours with a structured quote on all accessories lines — PDUs, cords, and mounting hardware. We do not quote UPS systems or high-voltage equipment.
Send a PDU RFQ