RFQ Center

Submit an RFQ for AI Infrastructure Accessories

One place to request quotes for the accessories around your GPU racks: PDUs, C13 and C19 power cords, fiber patch cords, DAC and AOC cables, server rails, blanking panels, temperature sensors, and leak detection. Send a structured AI infrastructure RFQ — a mixed BoM sourcing request, a PDU RFQ, a cabling RFQ, or a sample kit — and our sourcing engineers respond with a quote on accessories lines within 24–48 hours.

Upload a Mixed BoM

If your list spans several categories — rack power, cabling, rails, sensors — send it as one mixed BoM sourcing request instead of separate RFQs. Include rack count, voltage and plug type per destination country, cable lengths, certification requirements, MOQ expectations, and target lead time. Our team structures incomplete lines, matches suppliers per category, and returns a single consolidated quote. No BoM yet? Start from the GPU rack BoM template.

Send a PDU RFQ

PDU quotes live or die on configuration detail: input voltage and phase, plug type, C13 and C19 outlet quantities, and whether you need basic, metered, or switched units. The PDU RFQ checklist walks through every required field plus the optional ones — mounting, certification, destination country — that make a quote firm instead of indicative.

Send a Cabling RFQ

Fiber patch cords, DAC cables, AOC cables, and copper patch cords are quoted per SKU: cable type, connector ends, data rate, length, and quantity per length. The cabling RFQ checklist covers those fields plus jacket rating, labeling, and certification, so a 200-line cable list can be quoted line by line on the first pass.

Request a Sample Kit

Before committing a bulk order to a new sourcing channel, check the physical quality. A sample kit puts the exact accessories from your list — a power cord, a patch cord, a blanking panel, a sensor — in your hands first, so connector finish, jacket quality, and labeling can be verified before the main RFQ proceeds.

What Happens After Submission

Every RFQ is reviewed by a sourcing engineer, not an autoresponder. Within 24–48 hours you receive a structured quote on accessories lines — PDUs, C13 and C19 power cords, fiber patch cords, DAC and AOC cables, server rails, blanking panels, temperature sensors, and leak detection — itemized per SKU with price, MOQ, and lead time.

  • 1. We confirm receipt and flag any fields that need clarification.
  • 2. Suppliers are matched per category and quotes are consolidated into one document.
  • 3. You can request real product photos, videos, or a sample kit before ordering.
  • 4. Pre-shipment checking and consolidated packing are available on every order.

Scope note: we quote infrastructure accessories only — we do not supply GPUs, servers, or complete cooling systems.